380 kV line Heide West to Husum Nord

Stringing of 380 kV line Heide West to Husum Nord (Germany)

Victor Energy brought knowledge and experience in working with stringing of multiple phases with multiple bundle conductor configurations at once. Both 380 kV circuits were strung simultaneously.

Due to its windy coastal location, Schleswig-Holstein plays a special role in the energy transition. In 2016, an installed wind generation capacity of almost 3,400 MW (1,600 MW in the Dithmarschen grid area and 1,800 MW in Nordfriesland) was achieved on the west coast. In Schleswig-Holstein new regional wind plans are also in progress. By 2025, 37 terawatt hours of electricity are to be generated from renewable energies in Schleswig-Holstein. Therefore, Tennet (European TSO) proceeded with urgent necessary expansion of the extra-high voltage network between the North and Baltic Seas in 5 stages, in which the Heide West-Husum Nord line was a separate stage.

Stringing works on new 380 kV transmission lines:

  • Total sections length: 13 km
  • 438 km of ACSR Finch conductor in total
  • Quad-circuit structures: 2x 380 kV circuits,  2x 110 kV circuits and 2x OPGW
  • 380 kV – quadruple ACSR Finch per phase
  • 110 kV – duplex ACSR Finch per phase

Victor energy has completed stringing of multiple sections of 380kV Heide West to Husum Nord transmission line (13 km in total). The project was successfully completed between February 2020 and March 2021.

Our website uses non-privacy intrusive cookies in accordance with the Cookies Policy contained in Section 2 of our Privacy Policy.

Using our website means these cookies will be stored on your device.

Please review our Cookies Policy for information on how to opt out of receiving these cookies.