Stringing of 380 kV line Heide West to Husum Nord (Germany)
Due to its windy coastal location, Schleswig-Holstein plays a special role in the energy transition. In 2016, an installed wind generation capacity of almost 3,400 MW (1,600 MW in the Dithmarschen grid area and 1,800 MW in Nordfriesland) was achieved on the west coast. In Schleswig-Holstein new regional wind plans are also in progress. By 2025, 37 terawatt hours of electricity are to be generated from renewable energies in Schleswig-Holstein. Therefore, Tennet (European TSO) proceeded with urgent necessary expansion of the extra-high voltage network between the North and Baltic Seas in 5 stages, in which the Heide West-Husum Nord line was a separate stage.
Stringing works on new 380 kV transmission lines:
1511 Sparrow Drive
Nisku, AB T9E 8H9
T: +1-780-400-3700
Capraška ulica 6, 10000
Zagreb, Croatia
T: +385 1 6189 843
Bergsmansvägen 37
772 40 Grängesberg,
Sweden
ul. Białostocka 22 lok. 21H, 03-741
Warszawa, Poland
Our website uses non-privacy intrusive cookies in accordance with the Cookies Policy contained in Section 2 of our Privacy Policy.
Using our website means these cookies will be stored on your device.
Please review our Cookies Policy for information on how to opt out of receiving these cookies.