Completed projects

Each project is a promise fulfilled, a story of teamwork, endurance, and overcoming the unexpected. Engineered with resilience, executed with precision, delivered with dedication — built to last.

Svenska kraftnät is rebuilding the world’s oldest 400 kV transmission line between Storfinnforsen and Midskog. This is because several wind power plants are to be built in the area around Sollefteå which requires a stronger national grid. With a new line, Svenska kraftnät will take better advantage of electricity from wind power and the electricity supplied in the area will become more reliable, efficient and environmentally friendly.
Statnett (Norwegian transmission line operator) was in the process of building its next-generation main grid. An important step towards the next generation main grid was to increase the grid voltage from 300 to 420 kV (voltage upgrade). This would be done by converting existing 300 kV lines, and by replacing some old lines with new ones. The project was a part of Statnett’s larger “Vestre korridor” or West Corridor Project.
The expansion of the Mikułowa substation will increase the efficiency of the power grid in terms of cross-border exchange at the voltage level of 400 kV between the power systems of Poland and Germany and improve the conditions for evacuating power from Turów Power Plant.
Construction of 110/15 kV Towarowa substation and reconstruction of 110/15 kV Poznań Główna substation to improve the power supply to the city of Poznań is an investment undertaking of Enea Operator Sp. z o.o. and it was implemented with co-financing from EU funds (Infrastructure and Environment Fund and European Regional Development Fund).
As a part of the 110 kV transmission line from Vinodol to Rakitje, HOPS was in the process of rebuilding the Moravice – Vrbovsko section which was built in the 1950’s. As the section lifespan was nearing its end, the transmission line reconstruction was necessary to maintain the safety and reliability of the line.
Victor Energy brought knowledge and experience in working with stringing of multiple phases with multiple bundle conductor configurations at once. Both 380 kV circuits were strung simultaneously.