We build energy infrastructure for a safe future

Building capacity by delivering innovative electrical construction solutions across Europe and North America – backed by decades of success on North American mega-projects.
Line

Our Services

Line

Our Projects

400 kV Line Söderåsen – Barsebäck | Sweden

Victor Energy team built 45 km of 400 kv line in 10 weeks. Scope of work included demolition of old powerline, lattice tower construction & conductor stringing. The Söderåsen–Barsebäck 400 kV transmission line, originally commissioned in 1958, is being renewed by Svenska Kraftnät to ensure continued operational safety, reliability, and regulatory compliance.

230 kV Line Blackwater Gold | B.C. Canada

The purpose of the Blackwater Gold 230 kV Transmission Line was to connect the Blackwater Gold Mine to the BC Hydro grid. Victor Energy constructed 82 km of transmission line, including framing and setting 370 h-frame, three-pole, and dead-end wood pole structures.

420 kV Line from Fjotland to Duge | Norway

Statnett (Norwegian transmission line operator) was in the process of building its next-generation main grid. An important step towards the next generation main grid was to increase the grid voltage from 300 to 420 kV (voltage upgrade). This would be done by converting existing 300 kV lines, and by replacing some old lines with new ones. The project was a part of Statnett’s larger “Vestre korridor” or West Corridor Project.

110 kV line Moravice to Vrbovskoto | Croatia

As a part of the 110 kV transmission line from Vinodol to Rakitje, HOPS was in the process of rebuilding the Moravice – Vrbovsko section which was built in the 1950’s. As the section lifespan was nearing its end, the transmission line reconstruction was necessary to maintain the safety and reliability of the line.

400/220/110 kV Mikułowa Substation | Poland

The expansion of the Mikułowa substation will increase the efficiency of the power grid in terms of cross-border exchange at the voltage level of 400 kV between the power systems of Poland and Germany and improve the conditions for evacuating power from Turów Power Plant.